Hornsby Ku-Ring-Gai Hospital

Building Automation System

The Hornsby Ku-Ring-Gai Hospital Mental Health redevelopment is a $33.59M capital project, bringing together child, adolescent and adult mental health services and facilities in one location. It is designed to meet future service demands and requirements of surrounding communities. Alltech Services designed and installed a Building Automation System that controls and monitors the hospitals mechanical services.

22 Giffnock Avenue

Global property company, Goodman has constructed its new 14,500m2 commercial building in Macquarie Park. Seven Commercial levels, two basement levels and a ground floor cafe. The project will be delivered in line with an accelerated program of 45 weeks from development consent Alltech Services designed, installed and commissioned a BACnet compliant Building Automation System for 22 Giffnock Avenue.

Transgrid – 31 Ultimo Road Haymarket

GreenStar Building Automation System at Transgrid – 31 Ultimo Road Haymarket

Located in Haymarket, Sydney this new office building will transform an existing sub-station into a bustling nine level commercial office building. The building is approximately 14,000m2 and is targeting Green Star Office v3 Design. Alltech Services is entrusted with the design and installation of Building Automation, Energy Monitoring & Mechanical Elecitrcal & Switchboards.

Jewish Care, Bondi

Energy Management System – Jewish Care, Bondi

The new building will be the new home for Jewish Care and the focal point for the community at Saber St. Bondi Junction. The control for the air conditioning and car park carbon monoxide system are part of the controls installed by Alltech Services. The building has installed a NABERS compliant energy management system to measure and report on total building energy, gas and water.

St Barnabas Church, Broadway

Building Automation System – St Barnabas Church, Broadway

It burnt down in 2006 – so it was only fitting that the newly rebuilt St Barnabas Church on Broadway re-opened in 2012 and boasts a new modern looking church and a state of the art air conditioning plant controlled by a BACnet BMS system designed installed and maintained by Alltech Services.

“Barneys” is the first major new church building in Sydney in 100 years.

Bunnings Hardware

Building Automation System – Bunnings Hardware

The Bunnings warehouse at Balgowlah tight construction schedule was achieved with careful planning and delivery of switchboards, electrical services and BACnet BMS system designed and installed by Alltech Services. The automation system integrated with fire indicator, car park carbon monoxide monitoring and ventilation such as the macro air fans  on the shop floor.

Alltech Services

is trusted for small and large air conditioning installations for both residential and commercial projects. We provide air conditioning installation services across Sydney.

200 Goulburn Street

200 Goulburn Street

Central to the Sydney CBD, is this mixed use commercial and residential apartment building. Alltech Services was commissioned to supply and install the mechanical services control systems, switchboards, car park monitoring, stair pressure control, smoke exhaust control & air conditioning controls. The fast paced project was completed in December 2010.

FKP House

FKP House – New Building Management Controls & Energy meters with KNX technology

The Heritage listed building in the heart of Sydney CBD financial district is currently under a full refurbishment and includes an upgrade of the Building Controls System. Alltech Services has been entrusted with the design & installation of the KNX technology which controls the HVAC system. The system includes extensive power metering and controls compliant with Greenstar office fit out.